CLOSE

Specials

  • Construction Equipment
  • Apartment and Condominium Contractors Canada
  • Decking Canada
  • Architectural Glass Europe
  • MEP APAC
  • Construction Saudi Arabia
  • German Apartment and Condominium Contractors
  • Construction Law APAC
  • Outdoor Construction
  • Foundation Construction Canada
  • MEP Canada
  • Cold Storage Construction Canada
  • Cold Storage Construction APAC
  • Precast Concrete Europe
  • Construction Staffing Europe
  • Pre-Construction Services
  • Flooring System APAC
  • Scaffolding Canada
  • Swimming Pool Construction Canada
  • Construction Management Canada
  • Construction Insulation, Coating and Waterproofing
  • Flooring Systems Europe
  • Residential Construction
  • Concrete Canada
  • Construction Cladding Europe
  • Construction Cladding APAC
  • Concretes, Aggregates and Construction Materials APAC
  • Concretes, Aggregates and Construction Materials Europe
  • Commercial Contractors Europe
  • Commercial Contractors APAC
  • Dummy
  • Kitchen and Bath
  • Construction Management APAC
  • Landscaping Canada
  • Construction Coating Europe
  • Construction Tech Startups Europe
  • Insulation Services Europe
  • Mechanical Contractor Canada
  • Mould Remediation and Testing Europe
  • Swimming Pool Construction APAC
  • Building Sealing Solutions Europe
  • Construction Engineering Services
  • Mechanical Electrical and Plumbing
  • Roofing Systems Europe
  • Architectural Glass APAC
  • Startups APAC
  • Construction Forensic and Owners Representative
  • Flooring System
  • Waterproofing APAC
  • Wall Systems
  • Safety and Compliance Europe
  • Construction Cladding
  • Modular and Prefab Construction
  • Architectural Glass
  • Construction MENA
  • Construction Demolition and Recycling Europe
  • Modular Construction Europe
  • Construction Interiors
  • Steel Building APAC
  • HVAC
  • Doors and windows
  • Modular Construction APAC
  • Building Information Modeling APAC
  • Sustainable Construction APAC
  • Building Restoration and Maintenance
  • Commercial Contractors
  • Specialty Construction
  • Construction Engineering Canada
  • Construction Engineering MENA
  • Modular Construction Canada
  • Construction Demolition Canada
  • Roofing and Siding Systems
  • Construction Latam
  • Construction Staffing
  • Roofing Systems APAC
  • Construction Consulting
  • Steel Building Europe
  • Construction Demolition and Recycling APAC
  • Safety and Compliance APAC
  • Concretes, Aggregates and Construction Materials
Skip to: Curated Story Group 1
Construction Business Review
US
EUROPE
APAC
CANADA
MENA
LATAM
AUSTRALIA

Advertise

with us

  • APAC
    • US
    • EUROPE
    • APAC
    • CANADA
    • LATAM
    • AUSTRALIA
  • Home
  • Sections
    Architectural Glass
    Building Information Modeling
    Cold Storage Construction
    Commercial Contractors
    Concretes, Aggregates and Construction Materials
    Construction Cladding
    Construction Demolition and Recycling
    Construction Law
    Construction Management
    Flooring System
    MEP
    Modular Construction
    Roofing Systems
    Safety and Compliance
    Startups
    Steel Building
    Sustainable Construction
    Swimming Pool Construction
    Waterproofing
    Architectural Glass
    Building Information Modeling
    Cold Storage Construction
    Commercial Contractors
    Concretes, Aggregates and Construction Materials
    Construction Cladding
    Construction Demolition and Recycling
    Construction Law
    Construction Management
    Flooring System
    MEP
    Modular Construction
    Roofing Systems
    Safety and Compliance
    Startups
    Steel Building
    Sustainable Construction
    Swimming Pool Construction
    Waterproofing
  • Contributors
  • Vendors
  • News
  • Conferences
  • Awards

Thank you for Subscribing to Construction Business Review Weekly Brief

  • Home
  • Contributors

Custom Solutions for Runway Rehab: Innovative Equipment & Tracking Applications

Chris Weir, Director of Agile Operations, Aldridge
Tweet

In Los Angeles, CA, Aldridge crews utilized subject matter experts and an in-house development team to provide a transformative innovative solution to a runway rehabilitation project. 


The Runway 7R/25L rehabilitation project at Los Angeles' LAX airport was a fast-paced runway rehabilitation of one of the most heavily used runways in the United States. The rehabilitation took place during a 60-day closure of the runway. The overall scope of the project was removal and replacement of pavement and electrical infrastructure on 6000LF of the runway. This required complete removal and replacement of the in-pavement light bases within the paving area as well as installation of 700+ new light fixtures and 80,000LF of 5kV Cable.


As part of this pavement removal and replacement, Aldridge removed and replaced 300+ in-pavement light bases which required coring and removing a 3 ft Diameter x 3 ft Deep at each location. Known for innovative solutions in project execution, Aldridge’s innovation team custom-built a coring machine to install the new lights. This core barrel machine was specifically designed for work done at airports and has the ability to core up to a 48" diameter at a speed three times as fast as the traditional machines that are widely used throughout the industry.


Due to the project schedule constraints, Aldridge was required to complete the removal and replacement of the 300 base cans in just under two weeks, requiring crews to work around the clock for the first two weeks of the runway closure. The tight initial schedule for Aldridge to remove and replace the base cans required much more labor and project management oversight than a typical project running one shift. Management resources and subject matter experts from all over the company were brought in to work hand-in-hand with our West Coast teams to provide this extra support and oversight during the round-the-clock operation. 


With a large number of base cans and light fixtures to be replaced, the risk of re-work was ever-present. To eliminate this rework risk, the project team worked with our in-house IT development team to create a custom application for this project. This app would track the install process at each light location and provide the team with a quality checklist and area to provide photos that would ensure all work was complete and documented when each step of the installation was complete. The application allowed the third-party project QAQC representatives access to the database, which allowed them to sign off and accept the work. This documentation became a part of the overall project documentation deliverables. 


The use of this custom application designed by Aldridge developers was a major key to success in keeping this fast-paced project on track. With a wealth of knowledge and experience on the type of complex work Aldridge completes, this strong team is a valuable asset throughout the organization. 


 

The Runway 7R/25L rehabilitation project at Los Angeles' LAX airport was a fast-paced runway rehabilitation of one of the most heavily used runways in the United States


The project was completed and the runway was re-opened on time. Aldridge worked nearly 12,000 work hours to complete our scope of work on this project. 


About the company: Aldridge is a life-cycle partner providing innovative solutions to complex energy and transportation projects across the country. To learn more, visit aldridgegroup.com 


 


  • CUSHMAN & WAKEFIELD [NYSE: CWK]

    Projects Today Come Down to Nerves of Steel and Realistic Expectations

    Jason D’Orlando, Senior Managing Director, Cushman & Wakefield, Michael Morehead, Senior Director, Project and Development Services - Industrial, Cushman & Wakefield

  • WALMART [NYSE: WMT]

    Navgating the Challenges and Innovations in Mega Construction Projects: Building Competent Leadership and Embracing Technological Trends

    Seth Roy, Senior Director - Design & Construction, Walmart

  • MERITAGE HOMES

    Act Now to Address Aging Workforce

    Poli Peters, VP of Operations, Meritage Homes

  • ADVANCED DRAINAGE SYSTEMS [NYSE: WMS]

    Walking the sustainability walk: The case for EPR

    Brian King, EVP Marketing, Product Management and Sustainability, Advanced Drainage Systems

  • TOLL BROTHERS [NYSE: TOL]

    Transforming Construction: Overcoming Challenges And Embracing Technological Trends

    Korey Herndon, Safety Director, Toll Brothers

  • PORTLAND GENERAL ELECTRIC

    The Future of Construction Management

    Ken Pitta, Senior Construction Manager at Portland General Electric [NYSE: POR]

  • BRIXMOR PROPERTY GROUP

    Navigating the Landscape of Retail Project Management: Strategies for Success

    T.J. McKeever, Senior Project Manager, Brixmor Property Group

Copyright © 2025 Construction Business Review All rights reserved. |  Subscribe |  Newsletter |  Sitemap |  About us|  Editorial Policy|  Feedback Policyfollow on linkedin
This content is copyright protected

However, if you would like to share the information in this article, you may use the link below:

https://construction-equipment.constructionbusinessreviewapac.com/cxoinsight/custom-solutions-for-runway-rehab-innovative-equipment-tracking-applications-nwid-645.html

We use cookies on this website to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. More info

I agree